Our building maintenance and plumbing team have recently finished a complete bathroom renovation at Mr & Mrs Doyle’s home. The entire renovation project lasted for 15 days and involved the following features:
- Re-flooring with the wooden floor.
- Complete shower re-vamp with a brand new shower system.
- A new modern looking sink.
- New bathtub.
- Removed tiles and re-painted the room.
The existing bathroom was a very well looked after traditional styled bathroom that had grown tired. Through design and the careful selection fixtures & fittings, we were able to truly transform the existing suite achieving ‘dream bathroom’ status.
The customer is very happy with the overall finish.